Name | Price | Validity | Benefits | |
IR Pack 2997 |
₹ 2997.0 | 1 year | 2 GB, 100mins IC+OG (IN+Local), 20 SMS (USA, Europe, Gulf, Asia, Africa & more); In-Flight- 250 MB, 100mins OG, 100 SMS, 24hrs validity (selected Intl flights). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 755 |
₹ 755.0 | 5 days | 1 GB (USA, Europe, Gulf, Asia, Africa & more). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 595 |
₹ 595.0 | 1 day | In-Flight - 1 GB, 100mins OG, No incoming calls, 100 SMS (selected Intl flights). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 295 |
₹ 295.0 | 1 day | In-Flight - 500 MB, 100mins OG, No incoming calls, 100 SMS (selected Intl flights). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 756 |
₹ 756.0 | 5 days | 100mins IC+OG (IN+Local) (USA, Europe, Gulf, Asia, Africa & more). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 899 |
₹ 899.0 | 10 days | 1 GB, 100mins IC+OG (IN+Local), 20 SMS (USA, Europe, Gulf, Asia, Africa & more). Pack last changed 17 April 2024 |
Recharge
|
Barh (Hindi: , Urdu: ) is a town and subdivision of Patna District of Bihar. It is located along the Ganges River, 34 miles (55km) south-east of Patna.Barh railway station witnessed burning of many trains by a mob protesting the withdrawal of stoppage of trains there and many more causes. As of 2001 India census, Barh had a population of 105,206. Males constitute 54% of the population and females 46%. Barh has an average literacy rate of 85%, it is above than Indian literacy rate 66.7%; with 50% of the males and 35% of females literate. 15% of the population is under 6 years of age. NTPC is India's largest power-generating company with its current output being 32,500 MW.Around 3,300MW of coal-generated power is being added at Barh near Patna in Bihar, India. The three-unit 1,980MW Barh I are being built by Russian firm Technopromoexport (TPE), and the two-unit 1,320MW Barh II extension are being built by BHEL. Barh has been named a mega power project, and is owned by Indian...