3G/4G Data Pack 150 | |
---|---|
Validity: 30 DAYS 3G/4G Data: 500 MB, extra @Rs.0.04/10KB. . Pack last changed 17 April 2024 | |
3G/4G Data Pack 200 | |
Validity: 30 DAYS 3G/4G Data: 1 GB, extra @Rs.0.04/10KB. . Pack last changed 17 April 2024 | |
3G/4G Data Pack 1500 | |
Validity: 30 DAYS 3G/4G Data: 15 GB, extra @Rs.0.04/10KB. . Pack last changed 17 April 2024 | |
3G/4G Data Pack 1000 | |
Validity: 30 DAYS 3G/4G Data: 10 GB, extra @Rs.0.04/10KB. . Pack last changed 17 April 2024 | |
3G/4G Data Pack 181 | |
Validity: 30 DAYS 3G/4G Data: 1 GB / Day. . Pack last changed 17 April 2024 | |
3G/4G Data Pack 2000 | |
Validity: 30 DAYS 3G/4G Data: 20 GB, extra @Rs.0.04/10KB. . Pack last changed 17 April 2024 |
3G Data Plan 290 | |
---|---|
Validity: 30 DAYS 3G Data (Extra data offer is valid till 31-05-2017): 8 GB, extra @Rs.0.01/10KB. . Pack last changed 28 April 2024 | |
3G Data Plan 666 | |
Validity: 30 DAYS 3G Data (Extra data offer is valid till 31-05-2017): 9 GB. Unlimited Data Pack. Post FUP Speed: 128 Kbps. . Pack last changed 28 April 2024 | |
3G Data Plan 75 | |
Validity: 30 DAYS 3G Data (Extra data offer is valid till 31-05-2017): 1 GB, extra @Rs.0.01/10KB. . Pack last changed 28 April 2024 | |
3G Data Plan 170 | |
Validity: 30 DAYS 3G Data (Extra data offer is valid till 31-05-2017): 2 GB, extra @Rs.0.01/10KB. . Pack last changed 28 April 2024 | |
3G Data Plan 1711 | |
Validity: 30 DAYS 3G Data (Extra data offer is valid till 31-05-2017): 20 GB. Unlimited Data Pack. Post FUP Speed: 128 Kbps. . Pack last changed 28 April 2024 | |
3G Data Plan 501 | |
Validity: 30 DAYS 3G Data (Extra data offer is valid till 31-05-2017): 10 GB, extra @Rs.0.01/10KB. . Pack last changed 28 April 2024 |
Data pack 301 | |
---|---|
Validity: 30 DAYS Data: 50 GB Voice : NA SMS : NA Validity: 30 Days Disney+ Hotstar Mobile Subscription for 3 months Disney+Hotstar Offer T&C https://www.jio.com/en-in/disney-plus-hotstar-offer-terms-and-conditions. . Pack last changed 28 April 2024 | |
Data Pack 555 | |
Validity: 55 DAYS Data: 55 GB Validity: 55 Days Complimentary subscription to Jio Apps Disney+Hotstar Mobile Annual Subscription Disney+Hotstar Offer T&C https://www.jio.com/en-in/disney-plus-hotstar-offer-terms-and-conditions. . Pack last changed 28 April 2024 | |
Data Dack 241 | |
Validity: 30 DAYS Data: 40 GB Validity: 30 Days. . Pack last changed 28 April 2024 | |
Data Pack 181 | |
Validity: 30 DAYS Data: 30 GB Validity: 30 Days. . Pack last changed 28 April 2024 |
Data Plan 850 | |
---|---|
Validity: 30 DAYS 3G/4G Data: 7 GB, extra @Rs.0.05/1.0MB. . Pack last changed 22 August 2023 | |
Data Plan 2999 | |
Validity: 30 DAYS 3G/4G Data: 30 GB, extra @Rs.0.05/1.0MB. . Pack last changed 22 August 2023 | |
Data Plan 750 | |
Validity: 30 DAYS 3G/4G Data: 6 GB, extra @Rs.0.05/1.0MB. . Pack last changed 22 August 2023 | |
3G/4G Data Pack 98 | |
Validity: 28 DAYS 2G/3G/4G Data: 3 GB, extra @Rs.0.04/10KB. . Pack last changed 22 August 2023 | |
Data Plan 1999 | |
Validity: 30 DAYS 3G/4G Data: 20 GB, extra @Rs.0.05/1.0MB. . Pack last changed 22 August 2023 | |
Data Plan 3999 | |
Validity: 30 DAYS 3G/4G Data: 40 GB, extra @Rs.0.05/1.0MB. . Pack last changed 22 August 2023 |
Chandrapura is a census town in Chandrapura (community development block) in Bermo subdivision of Bokaro district in the Indian state of Jharkhand. It is situated on the northern banks of the river Damodar. The town is well known for the Chandrapura Thermal Power Station, a thermal-coal based power generation unit of Damodar Valley Corporation (DVC).The Chandrapura Thermal Power Station has an installed power generation capacity of 920 MW. However, out of 920 MW, only 890 MW is operational. The power station consists of 5 units 3 units of 140MW each, constructed by General Electric (GE) and remaining 2 units of 250 MW each, constructed by Bharat Heavy Electricals Limited (BHEL). The two new units were installed recently as a part of the expansion program of DVC's Power Project. BHEL had been contracted for the construction and installation of the new units. The units have been installed and have commenced production from late 2011. The power station had the pride of being largest pulverized fuel fire power station of Asia and Unit Number I was the first reheat unit installed in India with highest steam parameters. Electrical switchyard of CTPS is a pride of DVC, being Indias biggest network. Also, the chimney of newly constructed thermal power unit holds the distinction of having highest standing tower in India and 4th highest in Asia within its township area. The power plant also provides employment to a lot of people in the surrounding regions. The power plant was a major source of pollution for the adjoining areas owing to the coal-based generators, but things changed after electrostatic precipitators were installed in the chimneys, and large-scale afforestation was carried out, which lowered the pollution levels significantly.