Name Price Validity Benefits
168 GB Combo Unlimited Data Pack

769.0 84 days Unlimited voice calls (Local/STD) any-net in Home LSA and National Roaming (including Mumbai and Delhi) + U/L Data with speed reduced to 40Kbps after 2GB/day + 100 SMS/ day is including MTNL area Mumbai and Delhi + BSNL Tunes + Hardy Mobile Games service by M/s ONE97 communications limited + Challenges Arena Mobile Gaming Service on Progressive Web App(PWA) by M/s Onmobile Global Ltd + Lystn music services provided by M/s Tellyfonic Digital Media + Lokdhun+ Zing + Astrotell and GameOn services by M/s Ubarri Marketing Private Limited + GAMEIUM premium gaming application by M/S ADVYSORS INC..
Pack last changed 25 April 2024
Recharge
1 GB / Day Combo Unlimited Data Pack

18.0 2 days 2G/3G Data: 1 GB / Day. Unlimited Data Pack. Post FUP Speed: 40 Kbps. Local, STD & Roaming Calls (including MTNL): Unlimited.
Pack last changed 25 April 2024
Recharge
Combo Topup - Rs. 10.0 Talktime

247.0 30 days Rs.10 Talk Value in Main account balance + 50GB Data at high speed (Post which unlimited @ 40 Kbps) + U/L voice + 100SMS/day + BSNL Tunes.Freebies Validity of 30 days is not applicable for Rs.10 in main account balance..
Pack last changed 25 April 2024
Recharge
10 GB Combo Data Pack

147.0 30 days 2G/3G Data: 10 GB. Local, STD & Roaming Calls: Unlimited. + BSNL tunes.(including MTNL network in Mumbai and Delhi).
Pack last changed 25 April 2024
Recharge
2 GB / Day Combo Data Pack

98.0 18 days 2 GB/day + EROS NOW Entertainment Services.Multiple recharge facility is available.T and C apply..
Pack last changed 25 April 2024
Recharge
2 GB / Day Combo Unlimited Data Pack

97.0 15 days 2G/3G Data: 2 GB / Day. Unlimited Data Pack. Post FUP Speed: 40 Kbps. Local, STD & Roaming Calls: Unlimited. Lokdhun Content. (Including Mumbai and Delhi ).
Pack last changed 25 April 2024
Recharge
More Plans

About Farakka ( Farrakka / Barrage / Township )

Farakka Barrage is a barrage across the Ganges River, located in the Indian state of West Bengal, roughly 16.5 kilometres (10.3 mi) from the border with Bangladesh near Chapai Nawabganj District. Construction was started in 1961 and completed in 1975 at a cost of 156.49 crore (US$23 million). Operations began on 21 April 1975. The barrage is about 2,240 metres (7,350 ft) long.[1] The feeder canal from the barrage to the Bhagirathi-Hooghly River is about 25 miles (40 km) long.[2]