Name | Price | Validity | Benefits | |
IR Pack 595 |
₹ 595.0 | 1 day | In-Flight - 1 GB, 100mins OG, No incoming calls, 100 SMS (selected Intl flights). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 755 |
₹ 755.0 | 5 days | 1 GB (USA, Europe, Gulf, Asia, Africa & more). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 756 |
₹ 756.0 | 5 days | 100mins IC+OG (IN+Local) (USA, Europe, Gulf, Asia, Africa & more). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 195 |
₹ 195.0 | 1 day | In-Flight - 250 MB, 100mins OG, No incoming calls, 100 SMS (selected Intl flights). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 295 |
₹ 295.0 | 1 day | In-Flight - 500 MB, 100mins OG, No incoming calls, 100 SMS (selected Intl flights). Pack last changed 17 April 2024 |
Recharge
|
IR Pack 649 |
₹ 649.0 | 1 day | 500 MB, 100mins IC+OG (IN+Local), 10 SMS (USA, Europe, Gulf, Asia, Africa & more). Pack last changed 17 April 2024 |
Recharge
|
Gopalnagar is a village in Singur CD Block in Hooghly district in the Indian state of West Bengal. Gopalnagar is located at 224944N 881250E.As per the 2011 Census of India Gopalnagar had a total population of 12,232 of which 6,278 (51%) were males and 5,954 (49%) were females. Population below 6 years was 933. The total number of literates in Gopalnagar was 9,901 (87.63% of the population over 6 years).Singur gained international media attention since Tata Motors started constructing a factory to manufacture their $2,500 car, the Tata Nano at Singur. The small car was scheduled to roll out of the factory by 2008.[3] Land acquisition for the project faced strong political opposition right from the beginning.[4] In October 2008 Tatas announced withdrawal from the project.[5] Six villages Bajemelia, Beraberi, Gopalnagar, Joymolla, Khaser Bheri and Sinher Bheri were affected by land acquisition.[6][7]