Name Price Validity Benefits
3G/4G Data Pack 19

19.0 1 day 3G/4G Data: 1 GB.
Pack last changed 17 April 2024
Recharge
3G/4G Data Pack 181

181.0 30 days 3G/4G Data: 1 GB / Day.
Pack last changed 17 April 2024
Recharge
More Plans
Name Price Validity Benefits
Data Pack 1515

1515.0 1 year 2G/3G Data: 2 GB / Day. Post FUP Speed: 40 Kbps.
Pack last changed 17 April 2024
Recharge
3G/2G Unlimited Data Pack 1711

1711.0 30 days 3G Data: 30 GB. Unlimited Data Pack. Post FUP Speed: 128 Kbps.
Pack last changed 17 April 2024
3G/2G Data Pack 50

50.0 30 days 3G Data: 550 MB, extra @Rs.0.01/10KB.
Pack last changed 17 April 2024
3G/2G Data Pack 170

170.0 30 days 3G Data: 2.2 GB, extra @Rs.0.01/10KB.
Pack last changed 17 April 2024
3G Mobile Data Pack 151

151.0 28 days 2G/3G Data: 40 GB. + Zing..
Pack last changed 17 April 2024
Recharge
3G/2G Data Pack 75

75.0 30 days 3G Data: 1.5 GB, extra @Rs.0.01/10KB.
Pack last changed 17 April 2024
More Plans
Name Price Validity Benefits
Data Plan 250

250.0 30 days 3G/4G Data: 1 GB, extra @Rs.0.5/1.0MB.
Pack last changed 22 August 2023
Data Plan 100

100.0 30 days 3G/4G Data: 300 MB, extra @Rs.0.5/1.0MB.
Pack last changed 22 August 2023
Data Plan 450

450.0 30 days 3G/4G Data: 2 GB, extra @Rs.0.5/1.0MB.
Pack last changed 22 August 2023
3G/4G Data Pack 16

16.0 1 day 2G/3G/4G Data: 1 GB, extra @Rs.0.04/10KB.
Pack last changed 22 August 2023
Recharge
3G/4G Mobile Internet Pack 98

98.0 28 days 2G/3G/4G Data: 6 GB, extra @Rs.0.5/1.0MB. 2GB for 4G Handsets.
Pack last changed 22 August 2023
Recharge
More Plans

About Mettur

Mettur is an industrial and tourism town located in the Salem district in the state of Tamil Nadu, India. It is best known for the Mettur Dam. Mettur is known for its huge dam, power generation, chemical manufacturing, and aluminium production. Most of the water requirements for irrigation in Tamil Nadu is provided by the Mettur Dam. Usually the dam opens in June every year for irrigation in the Kaveri Delta. Mettur is also one of the primary sources of electricity for Tamil Nadu. The Mettur Thermal Power Station acts as a base load power plant for the Tamil Nadu Electricity Board (TNEB). As of 2011, the town had a population of 52,813. Mettur Dam, which forms Stanley Reservoir, is constructed across the Kaveri River in Tamil Nadu. It was constructed in 1934 and took 9 years to complete. Maximum height and width of the Dam are 214 and 171 feet respectively. Maximum storage height is 120 feet. Mettur Dam receives the water from both Kabini Dam and Krishna Raja Sagara Dam located in Karnataka. There are 2 hydroelectric power stations in Mettur Dam, the first constructed during British rule and the second during the Indian Republic. There is a park at the base of the dam called Ellis Park maintained by the Tamil Nadu Public Works Department.