Name | Price | Validity | Benefits | |
Cricket Pack 444 |
₹ 444.0 | 60 days | Data: 100 GB Voice : NA SMS : NA Validity: 60 Days. Pack last changed 8 April 2024 |
Recharge
|
ADD ON MRP 19 |
₹ 19.0 | Existing Pack | Data: 1.5 GB Validity: Existing Plan For users with an active validity plan. Pack last changed 8 April 2024 |
Recharge
|
50 GB 4G Data Pack |
₹ 301.0 | 30 days | Data: 50 GB Voice : NA SMS : NA Validity: 30 Days. Pack last changed 8 April 2024 |
Recharge
|
1 GB / Day Combo 4G Data Pack |
₹ 149.0 | 20 days | Data: 1 GB/day Voice: Unlimited Calls SMS : 100 SMS/day Validity : 20 Days Complimentary subscription to Jio Apps. Pack last changed 8 April 2024 |
Recharge
|
1 GB / Day Combo 4G Data Pack |
₹ 179.0 | 24 days | Data: 1 GB/day Voice: Unlimited Calls SMS : 100 SMS/day Validity : 24 Days Complimentary subscription to Jio Apps. Pack last changed 8 April 2024 |
Recharge
|
Cricket Pack 667 |
₹ 667.0 | 90 days | Data: 150 GB Voice : NA SMS : NA Validity: 90 Days. Pack last changed 8 April 2024 |
Recharge
|
Name | Price | Validity | Benefits | |
4 GB Combo Data Pack |
₹ 232.0 | 1 Month | Get Unlimited calls + 4GB Data for 1 Month. Pack last changed 17 April 2024 |
Recharge
|
4 GB Combo Data Pack |
₹ 232.0 | 1 Month | Get Unlimited calls + 4GB Data for 1 Month. Pack last changed 17 April 2024 |
Recharge
|
1 GB Combo Data Pack |
₹ 155.0 | 24 days | Get Unlimited Calls + 1GB Data + 300SMS. Pack Validity 24 Days. Pack last changed 17 April 2024 |
Recharge
|
1 GB Combo Data Pack |
₹ 155.0 | 24 days | Get Unlimited Calls + 1GB Data + 300SMS. Pack Validity 24 Days. Pack last changed 17 April 2024 |
Recharge
|
Contest Pack 45 |
₹ 45.0 | 180 days | Add on Pack: NO SERVICE VALIDITY. Enjoy missed call alert feature on Vi App for 180 days. Pack last changed 17 April 2024 |
Recharge
|
4 GB Combo Data Pack |
₹ 224.0 | 30 days | Get Unlimited calls + 4GB Data for 30 days. Pack last changed 17 April 2024 |
Recharge
|
Tarapur is a census town in Thane district in the Indian state of Maharashtra. It is an industrial town located some 45km north of Virar, on the Western Railway line of Mumbai Suburban Division (Mumbai Suburban Railway). Tarapur can be reached from Boisar, the nearest railway station. It is 20km off National Highway NH-8. The Tarapur nuclear power station houses two boiling water reactors (BWRs), each of 200 MW (De-rated to 160MW), the first in Asia, and a recent unit with two pressurised heavy water reactors each of 540 MW. This PHWR based power station is not only the largest nuclear power reactor in the country but also the largest power unit in India. It was commissioned seven months ahead of schedule, at a cost much lower than the original estimate, by the Nuclear Power Corporation of India. Tarapur Atomic Power Station (320 MW) (T.A.P.S.) was constructed by the American companies Bechtel and GE near village Akkarpatti. The new reactors (1080 MW) were constructed by L & T and...