Name | Price | Validity | Benefits | |
Plan Voucher 46 |
₹ 46.0 | 28 days | 10 Local Onnet Night Minutes - 28 Days at 2.5p/sec Local/National Calls 4p/10 KB, 10p/10KB while Roaming on non-Vodafone Idea Network Loc SMS Rs.1/National SMS Rs1.5 Night minutes benefit available from 2300 Hrs to 0600 Hrs only. Pack last changed 22 August 2023 |
Recharge
|
Name | Price | Validity | Benefits | |
Plan Voucher 128 |
₹ 128.0 | 18 days | Get 10 Local On-net Night Minutes. All local/National Calls at 2.5p/sec. Night minutes benefit available from 2300 Hrs to 0600 Hrs. Outgoing SMS - Rs1/1.5/5 for Local/STD/ISD. Service Validity- 18 days. Pack last changed 17 April 2024 |
Recharge
|
Name | Price | Validity | Benefits | |
Plan Voucher 46 |
₹ 46.0 | 28 days | Get 10 Local On-net Night Minutes for - 28 Days at 2.5p/sec Local/National Calls, Night minutes benefit available from 2300 Hrs to 0600 Hrs only.. Pack last changed 22 August 2023 |
Recharge
|
Bargi Dam is one of the first completed dams out of the chain of 30 major dams to be constructed on Narmada River in Madhya Pradesh, India. Two major irrigation projects, named Bargi Diversion Project and Rani Avantibai Lodhi Sagar Project, have been developed by Bargi Dam. The Narmada is the largest river in Madhya Pradesh, flowing towards the west and falling in the Arabian Sea. Its total length is 1312 km of which it covers 1072 km in Madhya Pradesh. The Central Water and Power Commission conceptualized the proposal of this dam construction in 1968 envisaging irrigation in 2,980 square kilometres and hydropower generation capacity of 100 MW (2x45 MW + 2x5 MW). (Source: DPR, Govt of M.P. 1968). Later the Bargi diversion scheme was planned, increasing the total irrigation potential to 4,370 square kilometres. The dam construction work started in 1974 and was completed in 1990 when the dam was filled to its complete capacity. Although the proposed power generation was 105 MW, currently only 90 MW is being generated in this HydroPower Generation Plant. Two independent units of 45 MW each have been set up and they function mainly during the evening peak in demand. The height of the dam is 69 m and length 5.4 km. A lake of about 75 km in length and 4.5 km width, spreading over 267.97 km. In Jabalpur, Mandla and Seoni districts is formed when the water is impounded up to the dam FRL of 422.76 m.