Name Price Validity Benefits
Combo Topup - Rs. 5.0 Talktime

199.0 30 days Data: 3GB; Calls: Unlimited local STD & Roaming; Validity: 30 days; SMS: 300; Talktime: Rs 5. Additional Benefits: Free HellotunesHello TunesSet any song as Hellotune for Free; Enjoy Wynk MusicWynkMusic, Hellotunes and Podcasts.
Pack last changed 17 April 2024
Recharge
Combo Topup - Rs. 5.0 Talktime

359.0 1 Month Data: 2.5GB/Day; Calls: Unlimited local STD & Roaming; Validity: 1 month; SMS: 100/Day; Talktime: Rs 5. Additional Benefits: Airtel Xstream Play (FREE 20+ OTTs)Enjoy 28 Days FREE access to 15+ OTTs such as Sony LIV, Lionsgate Play, Fancode, Eros Now, hoichoi, ManoramaMAX, and many more on Airtel Xstream Play. Watch smashing hits on your mobile, tablet or TV.; Unlimited 5G DataUnlimited 5G Data is over and above your plan limit and can be used in 5G Network areas only; Apollo 24|7 CircleApollo3 Months, at No Cost; Free HellotunesHello TunesSet any song as Hellotune for Free; Enjoy Wynk MusicWynkMusic, Hellotunes and Podcasts.
Pack last changed 18 April 2024
Recharge
Topup - Rs. 7.47 Talktime

10.0 Existing Pack Talktime: ₹7.47; Validity: NA.
Pack last changed 17 April 2024
Recharge
Topup - Rs. 81.75 Talktime

100.0 Existing Pack Talktime: ₹81.75; Validity: NA.
Pack last changed 17 April 2024
Recharge
Topup - Rs. 14.95 Talktime

20.0 Existing Pack Talktime: ₹14.95; Validity: NA.
Pack last changed 17 April 2024
Recharge
Topup - Rs. 423.73 Talktime

500.0 Existing Pack Talktime: ₹423.73; Validity: NA.
Pack last changed 17 April 2024
Recharge
More Plans

About Chandrapura

Chandrapura is a census town in Chandrapura (community development block) in Bermo subdivision of Bokaro district in the Indian state of Jharkhand. It is situated on the northern banks of the river Damodar. The town is well known for the Chandrapura Thermal Power Station, a thermal-coal based power generation unit of Damodar Valley Corporation (DVC).The Chandrapura Thermal Power Station has an installed power generation capacity of 920 MW. However, out of 920 MW, only 890 MW is operational. The power station consists of 5 units 3 units of 140MW each, constructed by General Electric (GE) and remaining 2 units of 250 MW each, constructed by Bharat Heavy Electricals Limited (BHEL). The two new units were installed recently as a part of the expansion program of DVC's Power Project. BHEL had been contracted for the construction and installation of the new units. The units have been installed and have commenced production from late 2011. The power station had the pride of being largest pulverized fuel fire power station of Asia and Unit Number I was the first reheat unit installed in India with highest steam parameters. Electrical switchyard of CTPS is a pride of DVC, being Indias biggest network. Also, the chimney of newly constructed thermal power unit holds the distinction of having highest standing tower in India and 4th highest in Asia within its township area. The power plant also provides employment to a lot of people in the surrounding regions. The power plant was a major source of pollution for the adjoining areas owing to the coal-based generators, but things changed after electrostatic precipitators were installed in the chimneys, and large-scale afforestation was carried out, which lowered the pollution levels significantly.