Name Price Validity Benefits
Topup - Rs. 81.75 Talktime

100.0 Existing Pack Talktime: ₹81.75; Validity: NA.
Pack last changed 17 April 2024
Recharge
Topup - Rs. 4237.29 Talktime

5000.0 Existing Pack Talktime: ₹4237.29; Validity: NA.
Pack last changed 17 April 2024
Recharge
Combo Topup - Rs. 5.0 Talktime

359.0 1 Month Data: 2.5GB/Day; Calls: Unlimited local STD & Roaming; Validity: 1 month; SMS: 100/Day; Talktime: Rs 5. Additional Benefits: Airtel Xstream Play (FREE 20+ OTTs)Enjoy 28 Days FREE access to 15+ OTTs such as Sony LIV, Lionsgate Play, Fancode, Eros Now, hoichoi, ManoramaMAX, and many more on Airtel Xstream Play. Watch smashing hits on your mobile, tablet or TV.; Unlimited 5G DataUnlimited 5G Data is over and above your plan limit and can be used in 5G Network areas only; Apollo 24|7 CircleApollo3 Months, at No Cost; Free HellotunesHello TunesSet any song as Hellotune for Free; Enjoy Wynk MusicWynkMusic, Hellotunes and Podcasts.
Pack last changed 18 April 2024
Recharge
Topup - Rs. 7.47 Talktime

10.0 Existing Pack Talktime: ₹7.47; Validity: NA.
Pack last changed 17 April 2024
Recharge
Combo Topup - Rs. 5.0 Talktime

199.0 30 days Data: 3GB; Calls: Unlimited local STD & Roaming; Validity: 30 days; SMS: 300; Talktime: Rs 5. Additional Benefits: Free HellotunesHello TunesSet any song as Hellotune for Free; Enjoy Wynk MusicWynkMusic, Hellotunes and Podcasts.
Pack last changed 17 April 2024
Recharge
Topup - Rs. 423.73 Talktime

500.0 Existing Pack Talktime: ₹423.73; Validity: NA.
Pack last changed 17 April 2024
Recharge
More Plans

About Sileru

Sileru River is a tributary of Sabari River. It originates in Andhra Pradesh and also flows through Odisha before merging with Sabari. Sabari river crosses the border into Andhra Pradesh to merge with Godavari river.[1] Sileru (known as Machkund in its upper reaches) river joins Sabari river at tri-junction boundary point of Andhra Pradesh, Chhattisgarh and Odisha.Sileru river has huge potential of hydro electricity generation which has been substantially harnessed by constructing Machkund (120 MW), Balimela (510 MW), Upper Sileru (240 MW), Donkarayi (25 MW) and Lower Sileru hydro (460 MW) power projects.[2] Chitrakonda (60 MW) hydro project located at the toe of Balimela earth dam is planned to utilise the head available across the earth dam.