Name Price Validity Benefits
Topup - Rs. 39.37 Talktime

50.0 Existing Pack Talktime: Rs.39.37. No Service Validity.
Pack last changed 22 August 2023
Recharge
Topup - Rs. 7.47 Talktime

10.0 Existing Pack Talktime: Rs.7.47. No Service Validity.
Pack last changed 22 August 2023
Recharge
Topup - Rs. 4237.29 Talktime

5000.0 Existing Pack Talktime: Rs.4237.29. Service Validity of 28 days.
Pack last changed 22 August 2023
Recharge
Topup - Rs. 847.46 Talktime

1000.0 Existing Pack Talktime: Rs.847.46. Service Validity of 28 days.
Pack last changed 22 August 2023
Recharge
Topup - Rs. 22.42 Talktime

30.0 Existing Pack Talktime: Rs.22.42. No Service Validity.
Pack last changed 22 August 2023
Recharge
Combo Topup - Rs. 74.0 Talktime

95.0 56 days 2G/3G/4G Data: 200 MB. Local & STD Calls @ 2.5 p/sec. Talktime: Rs.74.0.
Pack last changed 22 August 2023
Recharge
More Plans

About Barh

Barh (Hindi: , Urdu: ) is a town and subdivision of Patna District of Bihar. It is located along the Ganges River, 34 miles (55km) south-east of Patna.Barh railway station witnessed burning of many trains by a mob protesting the withdrawal of stoppage of trains there and many more causes. As of 2001 India census, Barh had a population of 105,206. Males constitute 54% of the population and females 46%. Barh has an average literacy rate of 85%, it is above than Indian literacy rate 66.7%; with 50% of the males and 35% of females literate. 15% of the population is under 6 years of age. NTPC is India's largest power-generating company with its current output being 32,500 MW.Around 3,300MW of coal-generated power is being added at Barh near Patna in Bihar, India. The three-unit 1,980MW Barh I are being built by Russian firm Technopromoexport (TPE), and the two-unit 1,320MW Barh II extension are being built by BHEL. Barh has been named a mega power project, and is owned by Indian...