Name Price Validity Benefits
3G/4G Data Pack 1500

1500.0 30 days 3G/4G Data: 15 GB, extra @Rs.0.04/10KB.
Pack last changed 17 April 2024
3G/4G Data Pack 19

19.0 1 day 3G/4G Data: 1 GB.
Pack last changed 17 April 2024
Recharge
3G/4G Data Pack 500

500.0 30 days 3G/4G Data: 4 GB, extra @Rs.0.04/10KB.
Pack last changed 17 April 2024
3G/4G Data Pack 2000

2000.0 30 days 3G/4G Data: 20 GB, extra @Rs.0.04/10KB.
Pack last changed 17 April 2024
3G/4G Data Pack 150

150.0 30 days 3G/4G Data: 500 MB, extra @Rs.0.04/10KB.
Pack last changed 17 April 2024
3G/4G Data Pack 300

300.0 30 days 3G/4G Data: 2 GB, extra @Rs.0.04/10KB.
Pack last changed 17 April 2024
More Plans
Name Price Validity Benefits
4G/2G Data Pack 200

200.0 30 days 2G/4G Data: 2 GB.
Pack last changed 22 August 2023
4G/2G Data Pack 1299

1299.0 30 days 2G/4G Data: 130 GB.
Pack last changed 22 August 2023
4G/2G Data Pack 299

299.0 30 days 2G/4G Data: 10 GB.
Pack last changed 22 August 2023
4G/2G Data Pack 699

699.0 30 days 2G/4G Data: 70 GB.
Pack last changed 22 August 2023
4G/2G Data Pack 399

399.0 30 days 2G/4G Data: 30 GB.
Pack last changed 22 August 2023
4G/2G Data Pack 525

525.0 30 days 2G/4G Data: 2 GB / Day.
Pack last changed 22 August 2023
More Plans
Name Price Validity Benefits
Data Plan 250

250.0 30 days 3G/4G Data: 1 GB, extra @Rs.0.5/1.0MB.
Pack last changed 22 August 2023
3G/4G Data Pack 98

98.0 28 days 2G/3G/4G Data: 6 GB, extra @Rs.0.04/10KB.
Pack last changed 22 August 2023
Recharge
Data Plan 100

100.0 30 days 3G/4G Data: 300 MB, extra @Rs.0.5/1.0MB.
Pack last changed 22 August 2023
More Plans

About Magdalla

The Port of Magdalla is a port located on the western shores of India in southern Gujarat, on the southern bank of the Tapti river. A deep water anchorage is located 10 nautical miles (19 km) southwest from the port. It is connected with Udhana GIDC and Pandesara Industrial Estate which is about 12 kilometres (7.5 mi) away. The port is connected with Surat by state highway No.66. An airport is located 3 kilometres (1.9 mi) from the port. Magdalla Port is also well connected by road and rail with several other towns in the area.After bifurcation of Mumbai State in 1960 the committee for development of Intermediate Ports recommended for the development of Magdalla Port site for cargo operation by carrying out required necessary dredging and creating necessary landing place and support fleet and infrastructure facilities taking into account the growth of Udhana as an Industrial area. Magdalla Port was opened out in 1966 as an intermediate Port during which year the port has handled Bananas as export cargo and fertilizers, foodgrain as Import cargo.[citation needed] In 1979 Kakarapar and Ukai Dam was constructed on Tapti River. Thereafter, in 197980, M/s. Narmada Cement Co. Ltd., was established. Magdalla Port came into operation from 1982.